Environmental requirements and laying process for runway lawns

- Feb 12, 2019-

The turf of the runway shall be inspected with the production unit for the turf before it is laid, and the material quality, density and weaving process of the turf shall be checked to meet the requirements for use. No more than 30 standard site connection points, and check whether the quality of the filler meets environmental requirements. During the laying process, special lawn tools are used to cut and sew the lawn according to the specifications, and the lapped lawn is cut smoothly.

 

The runway is connected by a special glue, and the joint should be no more than 2 mm. The temperature should not be too low when bonding, and the ambient temperature should be selected above 10 °C. It is not suitable for construction under rain or mild rain. Otherwise, the bonding time will be too long or even non-stick.

 

The filling of quartz sand and rubber particles for the lawn of the runway is the most important part of the construction process. Only when the surface material of the artificial lawn is installed, it can be filled with quartz sand and rubber particles after being inspected and leveled to meet the requirements. The specification and quantity of the fill are determined separately according to the height and density of the grass.www.frengrassturf.com