How to use commercial artificial lawns for drainage and construction techniques and processes

- Oct 19, 2018-

In the process of using commercial artificial lawns, it is forbidden to wear 9 cm long spikes to run on the lawn. To a certain extent, the vehicles are prohibited from walking on the lawn. If the commercial lawn is entangled and mossy. The range of lawn vines can be treated with a special anti-entanglement agent, and the lawn is not affected by the proper concentration. This type of anti-stripping agent can be attached to the lawn and then swept out with a hard broom.

Commercial lawns need to be effective in preventing the sewage from entering the lawn and rushing into foreign bodies. During the construction, a circle of kerbstone (curier stone) is built on the lawn to prevent sewage from entering. After paving, within six to eight weeks, the artificial turf needs to be cleaned every week, and the gravel should be swept to ensure that the grass stems are upright and the gravel is even. In case of snow, it is forbidden to step on the road immediately. It is necessary to sweep the surface of the snow before using it.

How is the commercial lawn drained?
When the commercial lawn is used, the drainage method is generally adopted. When the operation is performed, the underground water seepage system is directly related to the site structure, and the blind groove type is mainly used in the use. The drainage slope of the ground of the artificial turf should be controlled within the range of 0.3%~0.8%, the slope of the artificial turf field (without seepage function) should be no more than 0.8%, and the slope with the function of seepage should be 0.3%. The outdoor site drain is not less than 400mm.

Commercial lawn water construction technology and technology.
1. When the commercial lawn is used, its molten iron and rapid flow trough must be constructed with a mortar. The height of the step can be determined according to the topography and geology. The height of each step can be different, and the height can be different. The ratio of length should be compatible with the slope of the original ground. The height of the step should generally be no more than 0.5~0.6m, usually 0.3~0.4m.
2. The falling water of commercial lawn can be effectively poured with mortar masonry or cement concrete to some extent. The thickness of the side wall of the groove wall and the stilling pool is 0.25~0.4m for the masonry stone and 0.2m for the concrete. The height should be higher than the calculated water level by at least 0.2m, the thickness of the bottom of the tank is 0.25~0.4m, and the outlet is provided with a water barrier wall.
3. The falling water is generally equipped with a force-reducing raft. When set, the top width of the raft is not less than 0.4m, and there is a drain hole with a size of 5cm*5cm~10cm*10cm, so that when the water is interrupted, the water in the stilling pool is excluded. .
4. The sink sink is generally built into a rectangular shape, but the drop height is not large. The slope at the bottom of the tank is slow. It can also adopt a trapezoidal section. The trapezoidal drop tank should be 0.5~1.0m before the step and 1.0~1.5m after the step. Reinforce within the scope.http://www.frengrassturf.com/